CASE STUDIES
CASE STUDIES
OUR RECENT PROJECTS
Full “Compex” inspection
Since 2011 we have carried out full “Compex” inspection and electrical testing of all systems across Exolum Immingham’s West & East terminals. These works were carried out by our in house inspectors on a strict yearly regime, involving both detailed and visual inspections to BSEN60079 and BS7671.
Major electrical works associated with tank overfill protection systems for CLH-PS ltd
2020 saw new challenges associated with the Covid 19 pandemic but SES rose to the challenge and has achieved a high turnover of work on the back of regular client confidence in our workmanship and standards etc. We have undertaken major electrical works associated with tank overfill protection systems for CLH-PS ltd. Also we have carried out turnkey projects in relation to client specified road loading systems, materials handling and transfer systems within potentially hazardous gas groups.
Switch room rewiring projects on Petro-chemical storage facilities
During 2019 we undertook a number of switch room rewiring projects on Petro-chemical storage facilities located on the Humber Bank in North Lincolnshire. The Company has also maintained close customer relationships in respect of ongoing Compex & BS7671 inspection services for regular clients. Cathodic protection cabling, containment and glanding services have been undertaken at a major aviation fuel storage facility and we have been heavily involved with tank overfill protection systems including ROSOV valves and tank gauging / HHLA probes etc.
Complete electrical installation
Works during 2018 included the complete electrical installation for Spanish company Ingelia of their HTC plant at Immingham and the instrumentation / electrical installation of a specialist fuel handling system at Coventry University for Orange County UK.
Re-wiring instrumentation and electrical systems at a fuel storage depot for CLH-PS ltd
We have recently been involved with re-wiring instrumentation and electrical systems at a fuel storage depot for CLH-PS ltd on the South Bank of the River Humber. Works include Design / Calculations, HV cabling, Cable support infrastructure, SWA cabling, Ex LED lighting, Compex inspections and full systems drawings / asset management data base. Circa £500K to date.
£300K electrical / instrumentation project for Simon Storage Ltd
Immingham West Terminal involving the wiring up of 2 x replacement switch rooms and all associated cable infra-structure, cable installation works, terminations and panel works. All works were carried out on time and within budget.
£150K electrical / instrumentation design / build turnkey project for RE Group – Hull
This involved the design, manufacturer and installation of the main plant MCC panel, cable infra-structure, cable installation works, terminations and all commissioning works. Likewise all works were carried out on time and within budget for their oil dehydration facility.